四虎免看黄_亚洲精品综合第一国产综合_免费福利在线观看_野花在线无码视频在线播放_精品一区二区三区日本_亚洲av禁18成人毛片一级

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :4430 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.jylilong.com

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 欧美一级日韩一级亚洲一级 | 一区二区片 | 亚洲大片一区 | 亚洲精品天堂在线 | 国产精品麻豆久久久 | 国产综合久久一区二区三区 | 性欧美videos另类极品小说 | 大学生一级一a免费 | 亚洲日本乱码一区两区在线观看 | 国产精品久久久久久久日韩 | 免费超级淫片日本高清视频 | 精品午夜福利无人区乱码一区 | 国产精品v?尤物在观看2021久久 | 亚洲二区三区视频 | 99re66在线观看精品热 | 欧美日韩免费在线 | 91综合久久久久婷婷 | 国自产拍aⅤ在线天天更新 国产成人8x人网站在线视频 | 99爱99| 好男人好资源在线观看免费视频 | 丰满熟妇人妻中文字幕 | caoporn超碰cao12 | 日本高清有码 | 91久久精品凹凸一区二区 | 冥王星之恋泰剧在线观看 | 久久久久亚洲AV无码尤物 | 日韩欧美中文字幕在线观看 | 99久久99这里只有免费费精品 | 牛和人交VIDE欧美XX00186 xxxxxxxxx欧美 | 婷婷色婷婷开心五月四房播播 | 免费特黄夫妻录像影片 | 黄色激情网址 | 国产又色又爽无遮挡免费 | 91毛片网| 欧美一二三区在线 | 欧美精品日韩 | 很污网站 | 婷婷五月综合国产激情 | 国产剧情息子绝伦中文字幕 | 日韩美女在线视频网站免费观看 | 久久久国产视频 |