四虎免看黄_亚洲精品综合第一国产综合_免费福利在线观看_野花在线无码视频在线播放_精品一区二区三区日本_亚洲av禁18成人毛片一级

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

Construction notes of GCL

Release time:2020-5-14    This article is read :4796 Times

Construction notes of GCL


Construction notes of GCL

Installation Methods

Disposal of subgrades

1.the subgrades must be tamped before paving the GCLs, the surface should be smooth. And it should not have the obvious hollow space.

2.the surface should be dry.

3.the minimum angle of land surface exposed to the sun should be more than 30cm.

4.the construction of GCLs should be begin until checking out the foundation.

Preparation before paving the GCLs

1.drawing the GCLs paving order.

2.examining the GCLs appearance quality.

3.the construction of GCLs should be processed under the weather with no rain and snow.

GCLs Paving

1.when paving the GCLs, it can use the machine and also the manpower.

2.paving the GCLs according to the stated order and way.

3.paving the GCLs, seaming overlapping between mat and mat should be staggered.

4.there should not be sand and soil, hydrocele and so on impurity, to avoid affecting on the overlapping quality.

5.to avoid the GCLs gliding, had best to fix it with nails when installing in vertical and bevel. Such as drawing.

6.both sides of the GCLs are geotextile and woven geotextile, when paving, the geotextile should be next to the water.

7.when paving, examine the GCLs appearance at any moment Backfill.

a.GCLs paved must be backfilled on the day.

b.the sand or the sifted soil is the best choice, and the soil should not have impurity with more than 10mm.

c.the soil must be tamped every backfilling 50cm, and the degree of density should be more than 85%.

d.pay attention to the GCLs when tamping, it can not be damaged.

e.when backfilling in the planar surface, the thickness should be 30cm at least.

Construction notes of GCL
Previous:How to protect GCL during construction?

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.jylilong.com

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 迭部县| 河津市| 鞍山市| 上林县| 南靖县| 阳谷县| 库伦旗| 沙河市| 雅安市| 凌海市| 阆中市| 永春县| 麻栗坡县| 苍山县| 镇赉县| 南召县| 横峰县| 灵璧县| 梅河口市| 来宾市| 集贤县| 恩施市| 朔州市| 县级市| 金门县| 岑巩县| 锡林郭勒盟| 蒙城县| 东乌珠穆沁旗| 祁阳县| 辰溪县| 安义县| 林西县| 张北县| 安阳县| 扎囊县| 临潭县| 阳江市| 平遥县| 青龙| 策勒县|