四虎免看黄_亚洲精品综合第一国产综合_免费福利在线观看_野花在线无码视频在线播放_精品一区二区三区日本_亚洲av禁18成人毛片一级

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

Requirement of base surface when laying GCL

Release time:2020-4-7    This article is read :3510 Times

GCL manufacturer

       Requirement of base surface when laying GCL

       When laying the GCL, what are the laying requirements when laying the base surface? As a GCL manufacturer, Taian Hongyuan Geosynthetics Co., ltd. will take you to understand the GCL when laying. What are the requirements of the base!

       1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL or the upper layer of geosynthetics.

       2. The surface of the foundation soil must be flat and even, and the slope and elevation should be within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements. The base surface should facilitate the laying of GCL, HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

       3. Before laying the GCL, whether the upper surface of the foundation of the soil cushion GCL should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL.

       4. After the daily work, we prepare a signed foundation soil surface permit certificate, which must be signed by the owner ’s representative and then handed over to the supervision engineer.

       5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL that has been accepted becomes unqualified, the installed GCL must be reopened and prepared again 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

Requirement of base surface when laying GCL
Previous:What is the inherent role of geomembrane composite with non-woven anchor?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.jylilong.com

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 国产一区二区三区在线 | 欧美爆乳乱妇高清免费 | 欧美一区二区三区爽大粗免费 | 色多多入口| 国产91在线观看 | 国产极品美女高潮抽搐免费网站 | av免费观看一区二区 | 国产精品久久久久久无人区 | 久久精品亚洲天堂 | 国产免费黄网站 | 久久精品国产99精品国产2021 | 在线看高清中文字幕一区 | 日韩淫视频 | 日本免费黄色网 | 欧美久久一区二区 | 黑人与娇小精品av专区 | 91呦呦| 青青成线在人线免费啪 | 欧美熟妇bbbbbb搡bbbb | 国产av一区最新精品 | 欧美人与禽猛交狂配 | caoporn超碰进入页面 | 性色视频在线 | 国产成人综合一区人人 | 国产超碰人人做人人爽av大片 | 无码国产精品一区二区免费16 | 老头巨大挺进莹莹的体内免费视频 | 自拍论坛 | 国产妇女馒头高清泬20P多毛 | 少妇激情AV一区二区三区 | av一区在线播放 | 人妻少妇精品中文字幕av蜜桃 | 啊啊啊国产视频 | 日韩综合色 | 日韩在线网 | 天天躁日日躁狠狠躁性色avq | 天天综合网7799精品视频 | 国产精品人妻一区二区三区a | 久青草视频在线观看 | 麻豆免费高清在线观看 | 狠狠干网站|